ISSUANCE OF CERTIFICATE OF FINAL ELECTRICAL INSPECTION (CFEI) AND CERTIFICATE OF OCCUPANCY (COC)

ISSUANCE OF CERTIFICATE OF FINAL ELECTRICAL INSPECTION (CFEI) AND CERTIFICATE OF OCCUPANCY (COC)

Application of Certificate of Final Electrical Inspection is a requirement for Electrical Connection however, the Certificate of Occupancy is to certify that a building is in compliance with building codes and that it is suitable for occupancy to become operational – without a valid certificate, a building cannot be occupied.


Payment of fees will be based from the book of National Building Code of the Philippines.



Office or Division: Office of the Municipal Engineering


Classification: Simple

Types of Transaction: Government to Citizens  (G2C)

                                       

Who may avail: Owner / Applicant of the Building/Structure

PROCESS

Step 1


Accomplish and submit the Citizens Charter Service Request Form along with other required documentary requirements

AGENCY ACTION

Conduct site inspection of the building/structure 

Fees to be Paid:  None
Processing Time : 1 day
Person Responsible:
Building Official / Engr. CrisTubo 

Step 2

 

AGENCY ACTION
 

A one time electrical inspection fee equivalent to 10% of Total Electrical Permit Fees and

Php120.00 pesos for Annual Inspection Fee if the owner/applicant request inspections for the services such as Land Use Conformity, Architectural Presentability, Structural Stability, Sanitary and Health Requirements and Fire-Resistive Requirements 

which is based from the book of  National Building Code of the Philippines

Fees to be Paid:  None
Processing Time :5 minutes
Person Responsible:
Building Official / Engr. CrisTubo 

Step 3

Submission of Official Receipt (OR) 

AGENCY ACTION
Processing of pertinent documents 

Fees to be Paid:  None
Processing Time :10 minutes
Person Responsible:
Building Official / Engr. Cris Tubo 
Engineering Assistant 

Step 4

Receive the copy of the duly signed certificates 

AGENCY ACTION
Segregation of documents to  release the applicant’s copy of the certificates (CFEI and COC) 

Fees to be Paid:  None
Processing Time :5 minutes
Person Responsible:
Engineering Assistant 

                      TOTAL:                                                                                                                         Processing Time: 1 Day and 20  minutes